Construction of a composite forced draft cooling tower – Třinec

Construction of a composite forced draft cooling tower in the Třinec Iron and Steel Works

The construction involved a cooling tower containing a fan with a diameter of 6m. The fan is mounted on the PMH45-180D/400V slow-run motor. The cooling system consists of foil blocks of the REKO 20 cooling fill. Pultruded composite profiles were used for the supporting structure of the cooling tower.
Customer Energetika Třinec, a.s.
Place of realization Třinec
Start date 2014
Completion date 2015